Posts

Kudankulam Nuclear Power Plant-A brief view

Image
Kudankulam Nuclear Power Plant Kudankulam Nuclear Power Plant  (or Koodankulam NPP or KKNPP) is a  nuclear power station  in  Koodankulam  in the  Tirunelveli district  of the southern Indian state of  Tamil Nadu . Construction on the plant began on 31 March 2002, [1] but faced several delays due to the fishermen's objection. Unit 1 was synchronised with the southern power grid on 22 October 2013. The original cost of the two units was  ₹ 13,171  crore , but it was later revised to  ₹  17,270 crore ($2.6 billion). Russia advanced a credit of  ₹  6,416 crore ($0.97 billion) to both the units. In 2015, Nuclear Power Corporation Ltd (NPCIL) announced a price of  ₹  4.29/ kW·h  (6.4 ¢/kW·h) for energy delivered from Kudankulam nuclear power plant. The ground-breaking ceremony for construction of units 3 & 4 was performed on 17 February 2016. Work is expected to begin in April 2016. Due to operators...

Lester Allan Pelton – The father of hydroelectric power

Image
Lester Allan Pelton – The father of hydroelectric power Lester A. Pelton (1829-1908) - Inventor whose invention paved the way for low-cost hydroelectric power. Pelton was born in Vermilion, Ohio, in 1829. At age 20 he set out by foot to cross the plains and strike it rich. The first fourteen years he spent mining and wasn’t very successful. He moved to Camptonville and turned to carpentry, built homes, a school house, mine structures, and water wheels, eventually becoming a millwright. His interest was in the water wheel and from early 1878 to 1880 he tested 40 types of wheels with different buckets leading to the discovery of the “splitter” type bucket. A contest was held with four other makers of water wheels. His wheel surpassed the second best by 19 percent. Work of this crossed the country and order for his wheel came from everywhere. The Allen Foundry, in Nevada City, California, could not keep up with the orders being received. Pelton want to San Francisco and met with Mr. B...